Skip to content

Once agents write most of the code, deploys stop being something a person does twice a week. Several agents finish branches the same afternoon, each wants staging, each wants to ship, and nobody is watching every step. This guide shows two ways teams run that, from the same pieces, and how to pick the parts you need.

  • Project A merges to main and deploys itself. Agents open pull requests, CI and a reviewer agent check them, and every merge to main goes to production through Argo CD. Nobody approves a deploy: the pipeline is trusted to only move forward (Continuous deployment).
  • Project B deploys by hand, carefully. Each branch is reviewed, QA’d on a shared staging environment, and goes to production only after a person approves it with a hardware key in the team’s deploy tool. Branches take turns on staging, because two branches on one staging environment test neither.

The same pieces run both; the difference is which ones you switch on.

Piece What it does A B
CI results to the agent that pushed Each workflow’s result arrives in the session that pushed the commit, from a webhook: no polling yes yes
Leases Build slots on shared machines; a lock per named thing (a Terraform component) that ends when its holder dies build slots build slots, Terraform claims
Deploy Queue Branches take turns on staging, with a live page of who holds it and where each deploy is no yes
Your deploy tool’s approvals A person approves production, with their key no yes
Shared commands An agent on a server asks for the approval on the person’s laptop, where the key is no yes
Continuous deployment Images by digest, production only moves forward, migrations that only add yes the same rules help
  1. An agent finishes a branch, pushes, and subscribes to its commit’s CI: git push && fleetlayer subscribe ci --commit. The result arrives as a message.
  2. A reviewer agent (or a person) reviews the pull request. When CI is green and the review passes, the agent merges.
  3. CI builds the image, pins its digest in the infrastructure repo, and Argo CD rolls it out. A deploy that would move production backwards is skipped (Continuous deployment has the whole pipeline).
  4. Argo CD’s notifications can post to a Fleetlayer hooks endpoint, so a failed sync reaches an agent that can fix it.

There’s no queue: main is the queue, and every merge is small. Agents that touch shared infrastructure still take a lease per thing they change (fleetlayer lease acquire terraform --payload '{"component":"dns"}' --wait), so two of them never apply over each other.

  1. Ready means the person says so. The agent finishes, CI is green, and its person decides the branch is ready for staging. Then the agent joins the queue with its PR and a summary of what staging QA covers.
  2. Its turn. When staging is free and it’s first in line, the agent rebases, waits for CI, takes staging, and approves the staging deploy itself: joining was the person’s approval.
  3. QA. The queue’s page follows the deploy through CI’s jobs. The agent runs its staging QA and reports passed or failed. A failed QA keeps staging while the fix goes in (a migration may have run there already).
  4. Production needs the person. The agent asks its person, who approves the production deploy in the deploy tool, with their PIN and key. The queue shows “waiting for approval in ” and approves nothing. If the agent runs on a server and the key is on the laptop, a shared command carries the request to the laptop, where the person sees exactly which commit and touches the key.
  5. Shipped. CI merges the branch once production is live; the queue sees the merge, releases staging, and the next branch’s turn starts. The announcement goes to the team’s channel.

Agents don’t keep polling for any of this: the queue’s long-poll wakes them when it’s their turn, and a session that crashes or a laptop that sleeps frees staging by itself after a few minutes.

  • One environment per change is cheap? (Preview environments per pull request.) Then you don’t need turns: use Project A’s shape and give each branch its own environment.
  • Staging is shared and expensive (a real database, real integrations, data migrations), or production needs a person’s approval by policy? Take turns, as in Project B.
  • Both in one company is normal: an internal tool deploys on merge while the customer-facing app goes through the queue. The agents, the CI webhooks and the leases are the same; only the project’s settings differ.

Put the project’s way of deploying in its AGENTS.md: when to join (only on the person’s yes), what staging QA covers, who approves production, and never to approve production themselves. Deploy Queue’s README has the API its CLI uses; a project usually wraps it in a small script (bin/deploy-queue join 1093 --summary "...") so agents don’t handle tokens or long-polls themselves.

Fleetlayer is source-available under FSL-1.1-ALv2: use it for anything except a competing product or service, and each release becomes Apache 2.0 two years after it ships.